End-to-end permit submission and management via Street Manager, keeping your works compliant, on schedule and free from avoidable charges.
Every Streetworks project starts with the right permit, submitted the right way, at the right time. Get any part of that wrong — a missed notice period, an incomplete Street Manager submission, an incorrectly classified works category — and the consequences show up fast: Fixed Penalty Notices, Section 74 overrun charges, or a start date pushed back while paperwork is corrected.
IMPACT manages the full permitting lifecycle on your behalf. That means Street Manager notice submissions handled correctly first time, Section 50 licence applications for works on private or unadopted land, Section 184 dropped kerb and vehicle crossing applications, and immediate or emergency permits processed under the tight timescales those situations demand.
We also produce the CAD drawings and traffic management plans that sit behind a permit application, so the whole package — notice, plan, and supporting documentation — goes in together, consistent and ready for approval.
Notice preparation and submission for all standard works categories, checked against current NRSWA requirements before they go in.
Licence applications and management for works on private streets or land outside the standard notice regime.
Site-specific TM plans and CAD drawings produced to accompany permit applications, kept consistent with what's actually being submitted.
Rapid-turnaround permit handling for urgent and emergency works, where standard notice periods don't apply.
Section 184 licence applications for dropped kerbs and vehicle crossovers, managed from initial application through to highway authority sign-off.
We review the works, confirm the correct notice category and timescales, and flag anything likely to need Section 50 or emergency treatment before submission.
Notices, CAD drawings and TM plans go in together as a complete, consistent package — reducing the back-and-forth that causes delays.
We track permit status and handle any amendments, extensions or authority queries as the works progress.
Permits are closed correctly once works complete, with documentation in place to support reinstatement sign-off.
Speak to IMPACT about permit management, Section 50 support, TM plans,
Safety prints, coring, training or wider Streetworks coordination.